|
Case File: No.PW02 |
![]() |
![]() |
![]() |
Using 3.5m long light galvanized steel piles an island was reformed working from floating craft. |
![]() |
The backfill material for the island was transported from a loading area by barge and unloaded using a long reach 360° excavator. |
|
The island was finished off using reed rolls erected over the sheet piles. |
![]() |