Case File: No.PW02
Contract Title: Barton Broads
Commenced: Oct 98
Completed: Dec 98
Works Carried Out: Construction of New Island Using Floating Equipment

barton05
barton01 barton02

Using 3.5m long light galvanized steel piles an island was reformed working from floating craft.

barton04

The backfill material for the island was transported from a loading area by barge and unloaded using a long reach 360° excavator.

The island was finished off using reed rolls erected over the sheet piles.

barton03