Case File: No.PW03 Contract Title: Eltham Palace Commenced: Oct 98 Completed: Feb 99 Works Carried Out: Moat Dredging |
![]() |
|
Constructing temporary dam to half the moat. Half of the moat was drained down and the fish were temporarily displaced to the half not drained. | |
![]() |
Grass protection was laid where the plant machinery were to be used on the bank for silt removal. |
|
Lagoons were constructed to contain the dredged silt whilst drying out. 6" pumps and pipework were used to transport the silt minimising the effect to the existing surroundings. |
![]() |
![]() | The surrounding grounds were kept in good order at all times. |
|
A 3 ton mini-digger was used to handle the material where it was too large to be pumped |
![]() |